Client

National Construction Organisation

Brief

Draintech’s original brief was to carry out a conditional Survey of the existing drainage lines, this would enable our client to understand the condition of the network befo

Draintech’s original brief was to carry out a conditional Survey of the existing drainage lines, this would enable our client to understand the condition of the network before work began on the site. Following this survey, it was determined that number of existing lines were badly damaged and could not be dug up and replaced so Draintech were able to reline the pipes to remove the deformities and improve the existing network. Once the site work was completed Draintech carried out a survey of the drainage lines both exiting and new and produced a fully comprehensive report and plan of the site to be handed over to the owner of the development.

re work began on the site. Following this survey, it was determined that number of existing lines were badly damaged and could not be dug up and replaced so Draintech were able to reline the pipes to remove the deformities and improve the existing network. Once the site work was completed Draintech carried out a survey of the drainage lines both exiting and new and produced a fully comprehensive report and plan of the site to be handed over to the owner of the development.