t: 01656 767 001 - 0117 251 0142

Ford Engine Plant

Client

National Manufacturing Company

Brief

Draintech was asked to Map out the drainage network for the entire site.  Foul, Surface and Effluent lines were identified and were highlighted on Master Map as well as physically labelled. Draintech also carried out a conditional survey of all the lines and identified some lines that needed to be dug up and replaced and others that could be repaired by Relining or Patches.